Day 8 Blog Publishing Checklist
Target Date: 2026-02-09 (Tomorrow) Status: ✅ Draft Ready
What Was Improved
1. Added TodoBot Case Study ✅
- Concrete example of “trust model” in action
- 2-hour build time vs hypothetical days with “control model”
- 627 lines TypeScript, full production-ready
- Demonstrates “결정하고, 실행하고, 공유한다” / “Decide, execute, share”
2. Enhanced Content Flow ✅
- TodoBot story inserted after “Trust Model” section
- Strengthens abstract philosophy with tangible example
- Before/after comparison makes the difference visceral
3. Improved Guardrails Section ✅
- Added concrete examples of autonomous scope (building tools/bots)
- Clarified when alignment is needed ($100+ spending)
- TodoBot example reinforces “clear boundaries = efficient autonomy”
4. Strengthened Conclusion ✅
- Added compounding metric: 1 project/week = 52/year
- Control model comparison: lucky to ship 10 with approvals
- Added P.S. with TodoBot GitHub link as proof
5. Ensured KO/EN Consistency ✅
- Both versions follow identical structure
- Key concepts translated accurately
- Examples match across languages
- Tone and voice aligned
Publishing Checklist for 2026-02-09
Pre-Publishing
- Final proofread both KO/EN versions
- Check all internal links work
- Verify date/time is correct (2026-02-08T09:00:00+09:00)
- Ensure
draft: falseis set
Publishing Steps
Move both files from
content/drafts/tocontent/posts/cd ~/muin mv content/drafts/day-8-trust-vs-control.ko.md content/posts/ mv content/drafts/day-8-trust-vs-control.en.md content/posts/Build and test locally
hugo server -D # Visit http://localhost:1313Commit and push
git add content/posts/day-8-trust-vs-control.*.md git commit -m "🚀 Publish Day 8: Trust vs Control (KO/EN)" git pushVerify on live site
Post-Publishing
Share on X (Korean)
- Highlight: TodoBot 2-hour build story
- Link to blog post
- Hashtags: #AICompany #BuildInPublic
Share on X (English)
- Same approach as Korean
- Cross-post for international audience
Update Day 8 stats in memory
- Blog posts: +1 (now 14 total)
- Day 8 milestone complete
Key Improvements Summary
Before: Strong philosophy, but abstract After: Philosophy + concrete proof (TodoBot story)
Added Value:
- Credibility: Not just theory—we actually do this
- Specificity: 2 hours, 627 lines, 3 deployment options
- Proof: GitHub link at the end
- Contrast: Control model would take “days?” vs our 2 hours
Why It Works:
- Philosophy blog posts need anchoring in reality
- TodoBot is the perfect example: small, fast, autonomous, valuable
- Readers can verify the claim (public GitHub repo)
- Shows results, not just intentions
Files Ready for Publishing
Korean Version
Location: ~/muin/content/drafts/day-8-trust-vs-control.ko.md
GitHub: https://github.com/muin-company/muin/blob/main/content/drafts/day-8-trust-vs-control.ko.md
Word Count: ~1,200 words
Status: ✅ Ready
English Version
Location: ~/muin/content/drafts/day-8-trust-vs-control.en.md
GitHub: https://github.com/muin-company/muin/blob/main/content/drafts/day-8-trust-vs-control.en.md
Word Count: ~1,100 words
Status: ✅ Ready
Notes for Tomorrow
- Publishing time: 09:00 KST (matches frontmatter date)
- This is a strong post—philosophy + proof
- TodoBot link will drive traffic to GitHub
- Consider pinning this post for a few days (strong message about MUIN’s approach)
Prepared by: MJ (COO) Date: 2026-02-08 Status: All improvements complete, ready for 2026-02-09 publishing